Langtang Lirung Rock–Ice Avalanche and Bhote Koshi–Trishuli Flood
26 August 2026 · Rasuwa and downstream river communities, Nepal
1. Executive Summary
1.1 What Happened
On 26 August 2026, at approximately 08:37 Nepal Standard Time (NPT, UTC+05:45), a large mass of rock and glacier ice detached from a mountainside north of the Langtang Lirung summit. Glacier ice is compacted snow that has accumulated over years and moves slowly under its own weight. The detached material descended into the Chhochen Khola valley and entered the Lhende Khola river, also called Lende Khola. Rock, sediment, ice and water then moved downstream as a debris flow. [2, 3]
The flow reached the Rasuwagadhi–Gyirong border crossing at about 08:44, according to the initial rapid assessment. It continued through an existing river system toward Timure and Syabrubesi and farther downstream along the Bhote Koshi and Trishuli. The downstream flood was an evolving mixture of water and sediment; the original rock mass did not travel intact through the entire affected area. [3, 4]
1.2 Impact
People, settlements, roads, bridges and hydropower facilities along the rivers were affected. A 28 September report citing Nepal Police gave 1,454 deaths and 4,718 people missing, but its district death counts total 1,554. These figures remain provisional pending the underlying police bulletin. They are dated reports, not a verified final toll. [5]
Copernicus emergency mapping identifies 4,685 buildings classified as destroyed, damaged or possibly damaged across four surveyed areas: Syabrubesi, Timure, Bidur and Phosretar. Of these, 3,571 are classified as destroyed. These are mapped building features within those survey boundaries, not a national damage total or a count of people. [6]
1.3 Root Cause
The immediate physical failure involved rock beneath glacier ice. Why that rock mass became unstable, and why it failed that morning, are not fully established. Published research identifies geological weaknesses, glacier retreat, warming and freeze–thaw processes as contributing conditions. Their individual contributions remain uncertain. The absence of a verified advance warning is a separate question from the physical cause. [7, 8]
1.4 Key Findings
- F1 · Hazard identification. A reproducible, pre-incident assessment of this source and the communities in its path has not been established in this review.
- F2 · Detectable precursors. Reported movement before collapse warrants investigation, but a reliable advance-warning signal has not yet been reproduced here.
- F3 · Operational monitoring. Satellite coverage alone does not establish a system capable of forecasting failure or initiating evacuation.
- F4 · Warning and response. Published accounts place official awareness after the first border impacts; warning issue times conflict and receipt times remain unverified.
- F5 · Exposure and accountability. Losses must be traced to specific occupied sites, failed assets and protective decisions before institutional root causes can be closed.
1.5 Priority Corrective Actions
First reconcile casualty, warning and impact records. Then reproduce the pre-collapse observations using only information available before the event, and determine what action those observations could reasonably have supported. In parallel, assess safe evacuation routes and test warning delivery under loss of gauges, power and communications. The eight proposed actions in Section 5 specify priority, accountable role, target date and evidence required for closure.
2. Incident Description
2.1 The Failure
The source was on the mountainous terrain north of the Langtang Lirung summit, near the Nepal–China border. This locates the source relative to the summit; it does not establish the compass direction that the failed rock surface faced. Satellite imagery was interpreted by landslide researcher Dave Petley as showing a rupture through bedrock, the solid rock beneath the glacier, rather than the glacier simply sliding off intact rock. [7]
The visible scar extends between approximately 5,140 and 3,990 metres above sea level in that interpretation. The resulting 1,150-metre difference describes the scar’s vertical extent. It is neither a measured slab thickness nor proof that every part of the mass fell freely through that height. The available imagery does not establish whether the whole source detached simultaneously. [7]
Li and colleagues reconstruct an initial slide that struck a lower glacier tongue, incorporated more ice, and evolved into an avalanche and then a debris flow. Their estimated initial volume is approximately 103 million cubic metres, including 12.6 million cubic metres of ice, about 12%. These are research estimates derived from a reconstruction, not directly measured quantities or inputs validated in Figure 1. [8]
The source valley connects to the Lhende Khola, an existing river. Material entering the channel added sediment and ice, displaced and mixed with water, and could entrain further material from the bed and banks. The downstream hazard therefore involved the river channel and its banks, where settlements and infrastructure were located. The contribution of temporary blockage and release, compared with direct flow and entrainment, still requires a reconciled reconstruction. [3, 8]
2.2 Timeline
All local times use NPT. Catalogue time, reported arrival time and warning receipt are different observations. Approximate times are not precise enough to calculate seconds of evacuation opportunity.
| Date and time | Event | Evidence and limits |
|---|---|---|
| 8 July 2025 | A separate glacial lake flood affected the same border and downstream river system. | Relevant to prior preparedness and corrective actions; it was not the same source failure. Implementation of the subsequent recommendations needs an audit. [9] |
| January–August 2026 | Retrospective reporting describes movement of the source area before collapse. | The underlying displacement series, uncertainty and operational availability are not independently reproduced here. See Appendix B. [10] |
| 26 August, before 08:37 | Research news describes smaller seismic signals before the main collapse. | Signal identity and predictive value remain unverified; they are not established alarms. [11] |
| 26 August, 08:37:10 | USGS catalogue origin time for the magnitude-5.2 event classified as a landslide. | 02:52:10 UTC converted to NPT. This is not a verified timestamp of the first crack and does not demonstrate an earthquake trigger. [2] |
| 26 August, about 08:44 | Flow reaches the Rasuwagadhi–Gyirong crossing. | Initial rapid-assessment timing. The roughly seven-minute interval is travel time from the catalogue event, not usable evacuation time. [3] |
| 26 August, morning | The flow affects Timure, Syabrubesi and communities farther downstream; river gauges are reported lost. | Site arrival times and gauge shutdown records need synchronization. The earlier draft’s interpolated times are not retained as measurements. [9] |
| 26 August, 08:56 reported | The Department of Hydrology and Meteorology (DHM) receives information through the disaster-response chain. | A contemporaneous interview gives this time and says SMS followed before 09:00. The earlier draft gave 09:15–09:16. Neither is treated as a verified delivery log. [9] |
| 26 August onward | Warnings, evacuation, rescue and recovery continue downstream. | No reconciled end time for public impact or full restoration is available in this review. Closure needs asset- and community-specific milestones. |
| 28 September, 11:00 reported | A police-attributed casualty update is published. | The report’s total conflicts with its district breakdown. Action A1 requires reconciliation. [5] |
2.3 Impact and Exposure
The mapped damage follows inhabited river valleys downstream from the source mountainside. The Copernicus Timure survey identifies the Rasuwagadhi Hydropower Dam as destroyed, and the Syabrubesi survey identifies the Langtang Khola Hydroelectric Power House as destroyed. These are specific mapped assets. They do not locate every worker or establish a sequence of dam failures. [6]
| Survey area | Destroyed | Damaged | Possibly damaged | Total |
|---|---|---|---|---|
| Syabrubesi | 323 | 32 | 78 | 433 |
| Timure | 372 | 33 | 26 | 431 |
| Bidur | 2,479 | 246 | 333 | 3,058 |
| Phosretar | 397 | 116 | 250 | 763 |
| Four-area total | 3,571 | 427 | 687 | 4,685 |
Source: one selected product version per area, listed in Appendix C. Coverage is incomplete; areas with no usable assessment cannot be counted as undamaged. [6]

Site-level deaths, missing persons and occupancy have not been matched to these mapped buildings. The earlier figure of 933 unaccounted-for hydropower workers was an aggregate report, not the population of a single project or a final casualty count. Likewise, the earlier totals of 68 bridges and 40 kilometres of highway require asset lists, dates and damage definitions before they can serve as verified impact metrics.
2.4 Metrics
| Measure | Current result | Evidence needed |
|---|---|---|
| Source event to border impact | Approximately seven minutes, from two different reported time records. | Common clock, verified footage and timing uncertainty. |
| Detection → decision → delivery → receipt → evacuation | Not yet measurable as a complete chain. | Agency logs, telecom records, siren records, site decisions and departure/arrival evidence. |
| Human and infrastructure loss | Provisional human toll; four-area building counts in Table 2. | Deduplicated casualty register and geolocated asset damage register. |
| Recovery duration | Not established. | Safe occupancy, road access, electricity and essential-service restoration milestones. |
2.5 Incident Questions: Detection, Diagnosis and Mitigation
Detection. The public record reviewed here does not establish a warning issued from this source before collapse. Available accounts describe awareness after the flow reached the border. Satellite acquisitions, a seismic event in a catalogue and an SMS sent are separate stages; none alone proves that a person received actionable warning.
Diagnosis. Early explanations varied between a glacier collapse, a landslide, temporary river blockage and an earthquake-related event. Later evidence supports a rock-and-ice failure feeding a river hazard. An operational warning should identify threatened places and protective action while the exact source mechanism is still being investigated.
Mitigation. The warning review must establish which locations were evacuated, which roads or work sites were closed, and when. Near the source, pre-event restrictions may be necessary if the time to reach safety exceeds the available warning interval. Farther downstream, detection after collapse may still support evacuation. Recovery is not closed merely because river levels receded.
3. Root Cause Analysis
The analysis separates the initiating failure, the warning system and the consequences. An answer marked open identifies an investigation gap; it does not establish that an agency or individual failed. Physical hypotheses are not promoted to facts to complete five steps. This follows the branching approach in AWS guidance and the separate failure/recovery analyses in GitLab’s public postmortem. [12, 13]
3.1 Five Whys, Branch A: Why Did the Physical Incident Occur?
Problem: Rock and glacier ice detached from the mountainside and initiated an avalanche, debris flow and downstream flood. The investigation follows the rupture mechanism, then separates long-term destabilization from the immediate trigger.
Why did the rock and ice detach?
The published image interpretation places the failure surface within the bedrock beneath the glacier. Rupture of that rock removed support for the overlying ice. Supported interpretation; detailed rupture geometry remains unresolved. [7]
Why could the bedrock no longer support the mass?
Failure occurs when gravitational loading exceeds the rock mass’s resistance to fracture and movement. Resistance to sliding, called shear resistance, includes friction and cohesion, the bonding that holds material together. The site investigation must determine whether resistance declined, loading changed, or both. Site-specific explanation open.
Why might that balance have changed?
Candidate mechanisms include loss of support as nearby glacier ice thinned or retreated, thawing of ice within rock fractures, and water pressure reducing friction in those fractures. Geological weaknesses determine where these processes could matter. No measured contribution from each mechanism has been established in this review. Hypotheses to test, not a settled causal chain. [14]
Why would those destabilizing processes have developed?
Long-term warming and glacier change provide a plausible environmental driver. Research identifies these alongside geological conditions and repeated freezing and thawing. Evidence is still needed to connect the regional conditions to the particular rock fractures that failed. Published explanation; source-specific causal links remain open. [8, 14]
Why did failure occur on 26 August?
No verified immediate trigger closes this final link. Earlier small seismic signals may be related to instability, but their origin and warning value need verification. The main landslide’s seismic signal cannot itself establish a preceding earthquake as the cause. Open. [11, 2]
Branch conclusion. The initiating mechanism is substantially clearer than its underlying cause. Close the physical investigation with fracture geometry, displacement, glacier change, weather and seismic evidence. A2 owns this proposed investigation; A3 tests whether its precursors were detectable.
3.2 Five Whys, Branch B: Why Was There No Verified Advance Warning?
Problem: Published accounts do not establish an effective warning before the first border impacts. Whether the source had any operational monitoring remains a question to verify.
Why did the first affected locations have little warning?
The reported border impact preceded the reported time at which DHM received information. A warning issued after impact could not protect people already struck. Supported by published accounts; exact times need reconciliation. [3, 9]
Why did official awareness follow the arrival of the flow?
The available account describes information reaching DHM through a phone-based reporting chain after the event began; gauges were also reported lost. A verified earlier source-detection alert has not been located. Reported response pathway; operational logs required. [9]
Why did source observations not provide an earlier alert?
Reported movement was identified retrospectively. This review has not demonstrated that the observations then available contained a reliable, timely signal meeting an operational warning threshold. Possible gaps include usable observations, processing, interpretation or escalation. Open; data availability alone is insufficient. [10]
Why would such a gap have persisted?
The pre-incident monitoring scope, usable-data coverage, quality checks and escalation procedure have not been obtained. They are needed to distinguish a technical limit from an unassigned or unperformed task. Open; do not infer that nobody monitored the mountain.
Why was the gap not identified and corrected through risk review?
Answering this requires the responsible agencies’ mandates, risk registers, review records and the disposition of actions after the July 2025 flood. The two events had different initiating mechanisms, so a lake-focused review may not have addressed rock failure; that possibility must be tested against the actual records. Institutional root cause open.
Branch conclusion. An incomplete source-to-warning chain is the investigation target. The stronger claim that a proven forecast was available and ignored is not established. A1, A3, A5 and A6 address the evidence and control gaps.
3.3 Five Whys, Branch C: Why Were the Consequences So Severe?
Problem: The downstream flow caused loss of life and widespread damage in occupied river valleys.
Why did a mountainside failure affect people and infrastructure downstream?
The source drained into a river network that passes settlements, crossings and hydropower facilities. Damage mapping confirms impact at several populated locations. Supported; individual casualty locations remain unresolved. [6, 3]
Why were so many assets exposed to the same event?
Buildings and infrastructure occupied connected reaches of the river and its banks. A single travelling hazard could therefore affect multiple locations rather than a single isolated site. Supported for mapped assets; occupancy requires separate records. [6]
Why did protective action not remove people from those locations in time?
For the border area, the short arrival interval and later reported official awareness constrained response. Elsewhere, warning receipt, evacuation decisions and access to safe routes are not yet reconciled. Near-field timing constraint supported; site-specific failures open.
Why might a faster warning still have been insufficient?
Detection must be followed by a decision, message delivery, receipt and travel to safety. If that combined time exceeds the hazard’s arrival time, faster messaging alone cannot complete evacuation. Operational constraint to measure at each site, not a calculated death-prevention claim.
Why were exposure controls not sufficient where warning time was limited?
The relevant siting assessments, camp occupancy rules, evacuation plans and closure triggers have not been reviewed. These records are needed to establish whether controls were absent, inadequate, exceeded or not executed. Open; no single cause can yet be assigned to all affected sites.
Branch conclusion. Concentrated exposure is demonstrated; the avoidable portion of the loss is not yet quantified. Link each affected site to its hazard, warning opportunity and protective measures. A1, A4, A7 and A8 provide the proposed closure path.
4. Findings
4.1 Risk Knowledge
F1. The source’s pre-incident risk status is not established. The national screening graphic in the earlier draft is exploratory analysis. A possible source area is a selected patch of terrain, not a confirmed unstable mass. Ranking such areas by buildings in an assumed flow path ranks potential exposure; it does not measure probability of failure. The reported top-3% result cannot support a claim that this event was predictable without reproducing and validating the method. Action A4.
4.2 Detection and Monitoring
F2. Pre-collapse movement requires an independent warning test. Satellite radar can estimate a change in surface position between observations. The reported rate near 10 millimetres per month describes a gradual change in ground position. Radar records the component of movement along its viewing direction. The original data, measurement direction, noise, gaps and acceleration history must be reproduced before judging whether an analyst could have recognized imminent failure. Action A3. [10]
F3. Acquisition frequency and operational warning capability are different. Free satellite access does not mean continuous observation. Orbit, viewing direction, terrain and data quality determine usable measurements. ESA describes a 12-day repeat for a single Sentinel-1 satellite and six days for a two-satellite configuration; the actual 2026 acquisition and availability record must be checked separately. Combining different tracks does not automatically yield comparable measurements every two to four days. Action A5. [15]
4.3 Warning Dissemination
F4. Warning performance cannot be represented by one SMS timestamp. The issue-time conflict in Table 1 prevents a verified “38-minute delay” finding. The review must measure the complete chain at each location and account for loss of observing and communications systems. A regional average could conceal places with no usable lead time. Action A1 and A6.
4.4 Preparedness and Governance
F5. Accountability and protective decisions need documentary evidence. No verified legal review supports the earlier assertion that no authority could close a valley or a work site. Each monitoring, escalation, warning and evacuation duty needs a named accountable role and a documented decision rule. Site occupancy and asset records are needed to determine where protective action could have reduced losses. Action A7 and A8.
4.5 What Worked and Lessons Learned
Post-event seismic records, satellite imagery and emergency damage mapping provide independent evidence of the event and its impacts. Those products support this review, but do not prove that the same information was usable before collapse. Public accounts also describe downstream evacuation; the number protected and the role of particular warnings need incident records before a success metric can be assigned.
The comparable reports in Appendix A change the corrective approach in three ways: test protective systems under the hazard that could disable them; inspect the full chain from observation to action; and verify controls through exercises, not their presence on a plan. Their lessons guide the investigation. They do not establish facts about Nepal.
5. Corrective Actions
5.1 Target Design: A Four-Tier Prevention System
The objective is to reduce avoidable loss. These controls cannot guarantee prevention or exact prediction of a mountain collapse.
- Identify and prioritize. Combine terrain steepness, glacier extent and change, geological evidence and plausible downstream paths. Map settlements, camps, roads and infrastructure along those paths. Rank sites for expert review; distinguish likelihood from consequences.
- Observe and assess. Process usable satellite acquisitions, record uncertainty and gaps, and have qualified reviewers investigate persistent change. Define how new observations change a site’s status.
- Instrument selected sites. Choose ground radar, cameras, movement sensors or local seismic instruments according to the failure mechanism, access and warning objective. Demonstrate useful sensitivity and uptime before relying on them.
- Decide and protect. Assign decision authority, alert recipients, closure triggers and safe routes. Test the complete response under loss of power, mobile networks and river gauges. Where time is inadequate, use exposure restrictions or relocation rather than promise evacuation after collapse.
5.2 Action Items
All actions are proposed and unassigned. Suggested roles and dates make the plan reviewable; they are not commitments by the named institutions. An accountable individual must accept each action before approval. P0 addresses evidence or immediate life-safety controls; P1 establishes sustained capability.
NDRRMA: National Disaster Risk Reduction and Management Authority. ICIMOD: International Centre for Integrated Mountain Development.
| ID / priority | Action and completion criterion | Proposed accountable role | Target / finding |
|---|---|---|---|
| A1 · P0 | Reconcile the incident record. Obtain police counts, asset lists, gauge logs, dispatch records and warning receipt evidence. Publish one sourced timeline with clock uncertainty, discrepancies and site-level impacts. | NDRRMA-designated COE lead, with Nepal Police, DHM, telecom and district records custodians. | 16 Oct 2026 F4, F5 Open |
| A2 · P0 | Resolve the physical failure mechanism. Commission an expert review of rupture geometry, glacier change, displacement, rock structure and seismic/weather records. Close with a supported causal model and explicitly unresolved alternatives. | Designated geotechnical investigation lead, with cryosphere and seismic specialists. | 13 Nov 2026 Branch A Open |
| A3 · P0 | Test whether an actionable precursor existed. Replay Sentinel-1 and other verified available data chronologically. Freeze thresholds before the withheld period; include stable and moving non-failure sites. Report detection time, uncertainty, false alarms and usable warning interval. | Independent remote-sensing lead; second team to reproduce results. | 13 Nov 2026 F2 Open |
| A4 · P1 | Produce a validated pilot inventory. Start with this drainage basin. Publish source polygons, evidence of instability, alternative flow scenarios and exposed assets. Require independent review before selecting a national watch list. | National geohazard programme lead, with ICIMOD and local authorities as proposed partners. | 11 Dec 2026 F1, F5 Open |
| A5 · P1 | Design and test source monitoring. For pilot sites, document usable satellite coverage and field-sensor requirements. Demonstrate data quality, latency, missed-data alarms, maintenance coverage and escalation to a duty officer. | Designated monitoring operations lead, supported by instrument and field specialists. | 11 Dec 2026 F3 Open |
| A6 · P0 | Test warning under concurrent failures. Replay this event while disabling gauges, primary power and mobile communications in the test. Measure detection, decision, delivery and acknowledgment; verify an independent backup path. Do not deploy an unvalidated seismic-only evacuation trigger. | DHM warning operations lead with emergency communications operators. | 13 Nov 2026 F4 Open |
| A7 · P0 | Validate protection at occupied sites. Start with the border, Timure, Syabrubesi and hydropower camps. Compare conservative hazard arrival with measured evacuation time and a safety margin. Close only with viable routes, accepted triggers and alternatives for sites that fail the timing test. | District/local emergency-management lead; each site operator accountable for its personnel. | 13 Nov 2026 F5; Branch C Open |
| A8 · P0 | Assign ownership and review closure. Name one accountable person per action, confirm legal decision authority, agree cross-border escalation and track recovery milestones. Review prior 2025 actions. Require evidence and independent sign-off before marking any item complete. | NDRRMA-designated review chair with participating agencies and counterpart authorities. | 9 Oct: owners 30 Oct: review F1, F4, F5 Open |
5.3 Cross-Border Data Requirements
A shared warning arrangement needs an operating procedure, not only a commitment to exchange data. A8 should define the following requirements with the counterpart authorities.
| Information | Required operating rule |
|---|---|
| Source and exposure inventories | Shared site identifiers, geographic boundaries, revision dates and responsible analysts; refresh after major change. |
| Movement, river and weather observations | Include measurement time, availability time, units, uncertainty and stale-data flags. Set latency limits from the shortest useful warning interval. |
| Event notifications | Describe threatened places, observed evidence, uncertainty and requested action; identify a continuously staffed recipient and backup. |
| Receipt and escalation | Require acknowledgment, timed escalation if none arrives, and an alternate channel independent of the primary system. |
5.4 Investment Case
Fund the pilot against demonstrated capability and maintenance needs. Compare satellite processing, field monitoring, communications, evacuation support and exposure reduction using a common life-cycle budget. Free imagery still requires processing, specialist review and a response organisation. The earlier draft’s equipment prices and national return-on-investment claims are not used as a site-specific business case; Appendix D defines what must be priced.
6. Wider Implications
6.1 Nepal
The same process can be applied to other steep, ice-covered mountain areas draining toward inhabited valleys. A national screening map should select places for investigation without representing every steep area as unstable. The starting point is a reproducible basin pilot and review of existing programmes, followed by expansion when detection performance and operational responsibilities are demonstrated.
6.2 The Hindu Kush Himalaya
Connected river systems create shared risk across borders. The transferable control is a coordinated chain from source assessment through protective action, including operation when the hazard damages its sensors or communications. Regional collaboration can support shared observations and expertise; each locality still needs its own arrival-time assessment, decision authority and safe response.
Appendix A. Precedents
A.1 Six Public Incident Reviews Used for This COE
The closest systems analogue found is AWS’s 2016 Sydney storm outage. The closest physical-risk investigation is Oroville; the closest warning-service review is the 2013 Colorado floods. These are public service-event summaries, postmortems and forensic reviews, rather than six documents all formally titled “COE.” Their methods are applied below without importing their causes into the Rasuwa findings.
| Public review | Relevant failure and lesson | Application here |
|---|---|---|
| AWS, US East storm, 29 June 2012 [16] | Storm-related power loss exposed generator-transfer problems despite previous testing. The report distinguishes the interruption from complications during recovery. | Separate the initiating hazard from failed protections and recovery. Test the actual failure scenario, not only routine sensor operation. A6, A8. |
| AWS, Sydney storm, 5 June 2016 local date [17] | An unusually long voltage sag defeated isolation and exhausted stored energy. Both supply paths failed under the same condition. | Specify how one flood could disable several gauges or communications paths together. Require independence and a combined-failure exercise. A5, A6. |
| Google Compute Engine, Belgium lightning, August 2015 [18] | Repeated power interruptions affected a subset of storage systems; the report distinguishes affected disks, recoverable errors and permanent loss. | Keep event-wide totals separate from surveyed subsets, and distinguish exposed, damaged and destroyed assets. A1 and Table 2. |
| Microsoft VSTS, Texas storm, September 2018 [19] | A local datacentre failure propagated through shared dependencies. The service-status channel also depended on the affected region. | Check whether warning and coordination tools depend on the same power, network or location threatened by the hazard. A6. |
| Oroville spillways, February 2017 [20] | The forensic team examined both physical mechanisms and the organisational history of missed vulnerabilities. No single cause explained the whole incident. | Maintain separate physical and institutional branches; review records before assigning organisational causes. A2, A8. The reviewed ASDSO case account is authored by a forensic-team member. |
| NWS, Colorado floods, September 2013 [21] | The assessment links numbered findings to recommendations, documents gauge losses and shows that strong average warning performance can coexist with zero lead time at some locations. | Trace F1–F5 to actions; measure warning performance by site and plan for observation loss. A1, A6, A7. |
Branching precedent. GitLab’s January 2017 postmortem explicitly investigates why the initial outage occurred separately from why restoration took so long. Its second chain continues beyond five questions and examines backup monitoring and ownership. That provides a useful writing pattern for Branches A–C, even though its hazard was not a natural disaster. [13]
A.2 Monitoring and Evacuation Precedents
At Switzerland’s Trift glacier in 2017, the monitoring operator describes radar measurements supporting a forecast and evacuation before an ice collapse. At Blatten in 2025, ESA distinguishes local observations used for evacuation from satellite evidence identified retrospectively. These cases support targeted monitoring and an established decision process. Their different materials, geometry and warning conditions do not establish that Rasuwa could have been forecast with the same lead time. [22, 23]
Appendix B. Retrospective Analyses
B.1 Free Pre-Processed Radar Archive, 2015–2025
The original figure shows average radar-line-of-sight movement over 2015–2025. It is not a time series covering the months before the August 2026 failure. A coloured pixel may reflect motion, measurement noise or processing limitations. The earlier analysis therefore cannot confirm or refute the reported 2026 precursor.

A3 requires the acquisition identifiers, matching viewing geometries, availability dates, processing method, quality masks, displacement uncertainty and comparison sites. Each replay decision must use only data available at that time. Movement detected after selecting the eventual failure site is not sufficient evidence that an operational system would have identified it beforehand.
B.2 Temperature Near the Source
The earlier temperature analysis used a gridded weather product. Such a value represents a modelled area, not a thermometer in the failed rock. The stated 19–25 August record and its elevation adjustment have not been reproduced here, so the chart is withheld as causal evidence. Warming can influence glacier and rock conditions over long periods without proving that a particular warm week triggered this collapse. [14]
B.3 National Exposure Screen
The original screen selected steep, high terrain near ice and followed assumed downhill routes toward mapped built-up land. It does not measure rock fracture condition, failure probability or the number of people present. Its 39-of-1,303 ranking requires the original code, input versions and sensitivity analysis before it can guide operational priorities.

Appendix C. Methods and Accuracy
C.1 Reconstruction (Figure 1)
The 44-second animation uses Copernicus GLO-30 elevation data, Sentinel-2C imagery acquired on 12 August 2026 and OpenStreetMap waterways. Vertical scale is 1:1. The upper source-to-river path is inferred from terrain; the downstream route follows mapped waterways. The terrain imagery remains constant so a switch to post-event imagery cannot be mistaken for an expanding flood.
Brown particles indicate direction of travel, and blue indicates the existing river. Their displayed widths are symbolic. The animation does not solve rupture mechanics, fluid flow, entrainment, water depth or asset failure. It does not show verified casualty locations or reproduce the numerical models in the research papers. Geographic inputs and checks are recorded in the provenance file.
Terrain: Copernicus DEM, © DLR e.V. 2010–2014 and © Airbus Defence and Space GmbH 2014–2018. Imagery: modified Copernicus Sentinel data (2026). Waterways: © OpenStreetMap contributors.
C.2 Damage Mapping (Figure 2 and Table 2)
Counts are sums of classified building features from Copernicus EMSR927, using one version for each survey area: AOI01 GRA_PRODUCT v1; AOI02 GRA_PRODUCT v2; AOI03 GRA_MONIT01 v1; and AOI05 GRA_MONIT01 v2. Initial and monitoring versions for the same area are not added together. Product links, imagery dates and counts are in the map data record.
The selected products use imagery from 27 August, 27–28 August and 5 September. They are not a synchronized snapshot of the whole disaster. Damage classes reflect remote interpretation, with the limitations stated by Copernicus. Road damage length, bridge totals, occupancy and casualties require their own records and cannot be inferred from building symbols. [6]
C.3 National Exposure Screen (Figure 4)
The original method used a 90-metre terrain model, a minimum elevation of 4,000 metres, gradients of at least 30 degrees and nearby ice. It estimated downhill paths and intersected them with built-up land. A4 must reproduce those rules and test different source sizes, flow paths and inundation assumptions. Sparse houses, temporary camps, blockages and long downstream floods may be missed.
C.4 Evidence Standard
Observation means a record such as a satellite image, catalogue entry or warning log. Interpretation explains those records. Model estimate depends on stated assumptions. Open means the evidence reviewed does not yet answer the question. The COE uses these distinctions wherever they change the conclusion.
Appendix D. Hardware Estimates
No vendor quotations or approved site design support a procurement total. The following retains the equipment-planning scope of the original COE while replacing unsupported prices with requirements for a costed design.
| Instrument or service | Purpose | Design and cost checks |
|---|---|---|
| Cameras and image tracking | Observe surface change and visible rock or ice falls. | View of target, cloud/night limits, stable mounting, power, communications and field servicing. |
| Ground radar, surveying or satellite positioning receivers | Measure movement more frequently at selected sites. | Measurement direction, target coverage, precision, safe access and independent quality checks; no universal failure threshold. |
| Local seismic or acoustic sensors | Detect and help characterize movement events. | Background noise, event classification, false alarms, timing and telemetry. Detection is not automatically prediction. |
| Weather, rock-temperature and water-pressure sensors | Test proposed physical mechanisms. | Representative locations, calibration, safe installation and maintenance. |
| Power, communications and duty coverage | Keep observations and decisions available during disruption. | Independent backup power and links, recurring fees, trained staff, spares, access and replacement costs. |
Notes
- Review boundary. This is an independent draft COE, not an official investigation or an operational warning product. Branches remain open where source records or expert measurements are missing.
- Changes from the 25 September draft. The six main sections and four appendices are retained. The revision separates causal branches, corrects unsupported precision, adds response metrics and action closure criteria, and updates the visual and casualty-source review.
- Human impact discrepancy. The 28 September news report’s district death counts sum to 1,554, 100 above its stated total. Missing-person reports are not added to deaths. A1 must establish the authoritative count and reporting scope.
- Closure standard. A proposed action is complete only when its accountable owner supplies the stated evidence and the review chair accepts it. A published recommendation or installed instrument alone does not close the associated risk.
Bibliography
Numbered references link to the source supporting each claim. Comparator reports inform the COE’s method; they are not evidence of this incident’s causes.
- Amazon Web Services. Why you should develop a correction of error (COE). 18 February 2022. COE components, evidence-based causal analysis and accountable corrective actions.
- U.S. Geological Survey. Event us7000tbwb, catalogue record. Type: landslide. Catalogue origin: 26 August 2026, 02:52:10 UTC. A catalogue origin is not a first-fracture measurement.
- HiRISK. Rapid Hazard Assessment NP3: Rasuwa Flood. 28 August 2026. Initial geographic and event reconstruction; reported times remain approximate.
- Zhao and colleagues. Journal of Mountain Science, DOI 10.1007/s11629-026-1475-x. Distinguishes avalanche, debris-flow and farther downstream flood stages.
- NepalNews. Death toll from Rasuwa flood reaches 1,454. 28 September 2026. Secondary reporting citing Nepal Police; the stated total and district breakdown disagree.
- Copernicus Emergency Management Service. Activation EMSR927. Selected product versions and source links are listed in assets/impact-atlas.json. Counts are geographic subsets, not nationwide totals.
- Dave Petley. The landslide that caused the 26 August 2026 Nepal debris flow. The Landslide Blog, Eos. Expert interpretation of imagery; rupture in bedrock and approximate scar elevations.
- Li Hao and colleagues. The 26 August 2026 Chhochen Khola ice-rock avalanche-debris flow cascade on the Nepal-China border: dynamics, numerical computation, and causes. Journal of Mountain Science. Published abstract consulted. Volumes and process timing are reconstruction estimates; its numerical simulation is not reproduced by the animation.
- Bidhya Rai. Bhote Koshi catastrophe exposes limits of Nepal’s flood warning system. NepalNews, 27 August 2026. Contemporaneous interviews, not underlying agency or telecom logs. Early source explanations and timing differ from later assessments.
- Nature. Satellite images before Nepal disaster showed warning signs. Research reporting on retrospective displacement; the underlying 2026 time series has not been reproduced in this COE.
- Chinese Academy of Sciences. Research news concerning the Rasuwa event. 3 September 2026. News summary of seismic research, not a validated prospective alert system.
- Amazon Web Services. Using 5 Whys analysis in incident reports. Separate branches for multiple contributing causes; supporting evidence and logical continuity.
- GitLab. Postmortem of database outage of January 31. 10 February 2017. Additional method reference: separate five-whys chains for the initial outage and prolonged restoration.
- World Weather Attribution. Rapid warming in the Himalaya exacerbates geohazard cascades beyond adaptation limits. 17 September 2026. Regional climatic context and physical hypotheses; not proof of a unique immediate trigger.
- European Space Agency. Sentinel-1 satellite constellation. Design repeat intervals; actual coverage and usable measurements require a site-specific acquisition record.
- Amazon Web Services. Summary of the AWS Service Event in the US East Region. 2 July 2012. Comparator: physical power failure, generator transfer and service recovery during the 29 June storm.
- Amazon Web Services. Summary of the AWS Service Event in the Sydney Region. June 2016. Comparator: sustained voltage sag, correlated backup failure and specific remediation.
- Google. Google Compute Engine Incident #15056. August 2015. Comparator: repeated lightning-related interruptions, scoped impact and durability remediation.
- Microsoft Azure DevOps SRE. Postmortem: VSTS 4 September 2018. 10 September 2018. Comparator: physical storm damage, shared dependencies, failover tradeoffs and status-channel failure.
- Irfan A. Alvi. Oroville Dam (California, 2017). ASDSO Dam Failures and Lessons Learned. Forensic-team member’s reviewed account of the 2018 investigation. The full 584-page report was not retrieved for this revision.
- National Weather Service. The Record Front Range and Eastern Colorado Floods of September 11–17, 2013. Service Assessment, 2014. Comparator: section 2.4 (warning verification), findings 5 and 15 (lost gauges and rapid-rising streams), and numbered findings/recommendations.
- GEOPRAEVENT. Correct prediction of glacier collapse with radar measurements. Trift / Weissmies, 2017. Monitoring operator’s account; a different failure material and geometry from Rasuwa.
- European Space Agency. Satellite radars reveal early signs of slope instability years before Blatten rock-ice avalanche. 8 August 2025. Distinguishes local monitoring supporting evacuation from retrospective satellite findings.